Join Nostr
2025-12-11 16:54:55 UTC
in reply to

elala@nrw.social on Nostr: Which, btw, cost around 120.000 – 150.000 skilled jobs. Then, as now, grid ...

Which, btw, cost around 120.000 – 150.000 skilled jobs.
Then, as now, grid expansion stalled (mainly because Bavaria stood in the way and continues to do so), and today storage expansion is being sabotaged because research funding has been slashed. Nevertheless, there is a lot going on and development cannot be stopped, even if the current government is trying with all its might to turn Germany into an industrial museum.

8/x