Join Nostr
2025-01-30 21:22:38 UTC
in reply to

Scientist Rebellion on Nostr: The mine project entails: - A 100km high tension power line - Desalinisation of sea ...

The mine project entails:
- A 100km high tension power line
- Desalinisation of sea water requiring to pump it 1,000 meters above sea level
- Toxic waste water will be accumulated in lagoons above the town and the Tambo valley

5/n