Lucy Wallace on Nostr: When she arrived, months late, and after extensove sea trials, it was immediately ...
When she arrived, months late, and after extensove sea trials, it was immediately discovered that she has a major fault in her gear box... so she has been sent away again for repairs without carrying a single passenger.... meanwhile the MV Isle of Arran is scheduled to head away on her annual refit today. Calmac are not (allowed to?) reschedule this so we're left with the MV Alfred loaner boat who only has half a crew and does just 2 sailings a day. 2/